Team 1 Production Pine line
· Fri. October 19th
-modeling; work on morpheous rig, rough
model for animator’s scene
-vis dev; character drawings/or environment drawings
(floor plans, props)
-story; rough storyboards due
-animators; reference, thumbnails
l Sat October 20, 9am-whenever you need to go
Group work day
· Fri October 26th
-modeling; first blocking pass environment/or character from the vis dev
notes
-vis dev; final environment, props or character ideation (due)
-story; next pass
-animation; blocking
Sat October 27, 10am-whenever you need to go
Group work day
· Fri November 2nd.
-modeling; revisions with rough props
-vis dev; environment must be painted, props and characters must be
painted (due)
-story; next pass
-animation; revisions
l Sat November 3, 10am-whenever you need to go
Group work day
· Fri November 9th
-modeling; texture/color begins for environment
-story;revisions
-vis dev; story moments
animation; revisions
l Sat November 10, 10am-whenever you need to go
Group work day
· Nov 16th-18th, CTN and “Eat Lots of Stuff” Day—work on your own
· Fri . 23
--final revisions for all disciplines
l Sat November 24, 10am-whenever you need to go
Group work day, first pass of editing the
reel
l Sun November 25- 11:59pm, all works need to be uploaded in the team server
Final due day, all works need to be done and ready for the final reel editing.
l Mon-Nov. 26th
Discuses what music should go on the reel, Final pass of editing the
reel
沒有留言:
張貼留言